A leaking fire hydrant and failed water line isolation valve on Gagelake Ln is resulting in water losses for our system and needs to be removed and replaced. This maintenance is scheduled to begin at 8 am and conclude no later than 5 pm on March 3rd, 2022. Water service will be interrupted during this repair, but should not last longer than 4 hours. Inframark will work as quickly and safely as possible to ensure water service is restored as quickly as possible.
Once the repairs are complete and pressure is restored, Inframark will be flushing the area to restore water quality. It is advised that you flush your home’s lines through an outside faucet for 10 to 15 minutes after water pressure is restored. If, after that, you still experience water quality issues, please call in to Inframark directly so that a Field Technician can be dispatched to investigate the issue further.
Thank you for your patience and understanding while we work to ensure our community’s Water System remains functional and safe.